Roll forming machine,Roofing sheet forming machine,Rold rolling machine_Hebei Zizhuo machinery manufacturing co., ltd.
LOCATION:Home > NEWS > Company news >
NEWS CATEGORY
HOT PRODUCT

C section steel machine equipment operation and notes

2019-12-06 09:16:19

Both sides of the case should be fully lubricated oil. Power to start the machine for test run, there is no vibration, to check whether the connection is strong. Install the bolts and nuts to tighten, oil window to oil, take the blank working procedure: before the use of equipment, first empty car operation carefully observe, after everything is normal to install the mold. Noise, C section steel machine equipment operation and matters needing attention:

Put the blank by hand, when installing the mold, the power must be cut off, whether the movement of each part is coordinated. To turn the table, move the motor belt or large gear by hand. To prevent the slide seat natural fall, and make the slide seat up to the highest point. Because the net frame in the high altitude sliding method is overhead operation, the construction progress is accelerated. Cause an accident. Especially suitable for the use of the above network frame and the need to carry out the case of three-dimensional cross construction, it is best to use a piece of support between the bottom of the table and sliding seat. The construction method of hoisting and emplacement with lifting equipment, because the emplacement of the whole net frame depends on lifting equipment to realize.

C section steel machine equipment installation method

High - altitude slip method for installation of C - section steel machine equipment

High-altitude sliding method refers to the installation method of splicing the tile press unit into a whole by sliding single strip (or strip by strip) to the design position on the pre-arranged slide rail. No need for large equipment and traction equipment.

C section steel machine equipment performance:

High strength: high strength steel plate as the base material (tensile strength 5600KG/CM) plus the most advanced design and rolling forming. The key point of construction is the control of synchronous sliding of the slip unit, which can fully meet the requirements of the fire code. It is decided that the installation is simple. The welding and splicing of the whole network frame are all carried out on the ground.

Durability: multiple studies have shown a shortened construction cycle. After every 10 years spray anticorrosive coating. Has no impact on the internal construction of the building and can meet the needs of any style of building,

Integral hoisting method for installation of C section steel machine equipment

Integral hoisting method refers to the net frame on the ground after the total assembly, with excellent structural characteristics,

Fire prevention: the surface material and heat preservation material of color composite sandwich board are non-combustible materials.

Fast installation: the light weight composite panels, the characteristics of the splicing type installation and can be arbitrarily cut, easy to guarantee the quality of construction, can greatly improve the efficiency, save time limit for a project, so the ability of lifting equipment and lifting movement control is particularly important and widely used abroad over 40 years, confirmed by the special coating processing of color steel plate in 10 to 15 years, the construction is focused on network frame synchronization control of rising plank life can reach more than 35 years,

Beautiful: the clear lines of the pressed steel plate can be more than dozens of colors, and the displacement control of the net frame in the air can achieve satisfactory results.

SITE NAVIGATION
CONTACT US
CONTACT

MANAGER: Ms. Jessica Lee

MOBILE PHONE:+86 18713755177

E-MAIL: jessielff@gmail.com

E-MAIL: jessielff1106@hotmail.com

ADDRESS:NORTH OF NO.5 ROAD, ECONOMIC DEVELOPMENT ZONE, BOTOU CITY HEBEI P. R OF CHINA

Copyright © 2019-2020 www.chnrollformingmachine.com. All Rights Reserved SoaringMechatroniceCO.,Ltd

ZIZHUO MACHINERY